AC20-02 F.R.L.Combination Air Filter, Regulator & Lubricator
description1
AC20-02 F.R.L.Combination Air Filter, Regulator & Lubricator
Manual Drain AC20-02 Portsize:1/4" F.R.L.Combination Air Filter, Regulator & Lubricator.
Auto Drain AC20-02D Portsize:1/4" F.R.L.Combination Air Filter, Regulator & Lubricator.
NANPUAC20-02 F.R.L.Combination Air Filter, Regulator & Lubricator

| AC | 20 | 03 | BSP | M |
| Series Number | Body Size | Port Size | Thread Type | Drainage Method |
| 20 | 02:1/4" | BSP | A: Manual Drain | |
| 30 | 03:3/8" | PT | D: Auto Drain | |
| 40 | 04: 1/2" | NPT | Differential Pressure Drain |
NANPUTechnical Specifications
| Model | ||
| Manual Drain | (L/min)Rated Flow Rate | |
| AC20-02 | 500 | |
| AC30-03 | 2000 | |
| AC40-04 | 4000 | |
| Max Input Pressure | 1.2Mpa{12.24kgf/cm²} /174.04Psi |
| Max Operating Pressure | 1.0Mpa{10.2kgf/cm²} /145Psi |
| Temperature Range | 5~60℃ |
| Filtration Accuracy | 5μm, 40μm |
| Bowl Material | Polycarbonate |
| Bowl Guard | AC20 (None) AC30-40(YES) |
| Suggested Oil | Turbine Oil No. 1 ISO-VG32 |
| Pressure Range | AC20~40/0.05~0.85Mpa(0.51~8.7kgf/cm² )/0~125Psi |

Installation and Operating
1.Preparation
The assembly of all calibration shall meet the maximum flow requirement.
Please clean the port and fitting before installation, it will effectively avoid bring dust to the air path.
Pay attention to direction of air flow and arrow pointing on product body if correct, minding port and thread size if match. .2. Pressure Adjustment
Pull up the knob of pressure gauge, rotate:
If you do clockwise rotation, pressure will rise steadily.Pressure will down when you rotate counterclockwise.
Stop turning after reaching the required index and lock down the knob,forget this step you may face leakage problem. 
Pressure Adjustment and Drainage
3. Dial Reading
Make sure that the pressure gauge is tightly installed on the main body, and pay attention to whether the reading rises and falls smoothly while adjusting pressure.
4.Drainage
Drainage column will automatic excrete if there is no pressure,and it will close during the air flow passing. When the water level is beyond upper limit, drainage is necessary, otherwise that will cause poor dehumidification.
The fitting on the drain head can be used to connect air hose, you can also freely remove it according to your needs.

Oil Adjustment and Refueling
5. Oil Adjustment
Rotate the needle valve in the “+” direction to increase the oil absorption speed, and it will slow down or stop when you rotate to “-” direction.
6. Refueling
Rotates refueling screw clockwise, oil you add should not exceed 80% of bowl. After refueling, please tighten the refueling screw.





